subject
Business, 11.12.2019 21:31 glitterforever2739

Calculating activity-based costing overhead rates assume that manufacturing overhead for goldratt company consisted of the following activities and costs: setup (1,000 setup hours)$118,000 production scheduling (400 batches)60,000 production engineering (60 change orders)150,000 supervision (2,000 direct labor hours)46,000 machine maintenance (12,000 machine hours)60,000 total activity costs$434,000 the following additional data were provided for job 845: direct materials costs$7,000 direct labor cost (5 milling direct labor hours; 35 finishing direct labor hours)$1,000 setup hours5 hours production scheduling1 batch machine hours used (25 milling machine hours; 5 finishing machine hours)30 hours production engineering3 change orders (a) calculate the cost per unit of activity driver for each activity cost category. setup $answer 118 production scheduling $answer 150 production engineering $answer 2,500 supervision $answer 23 machine maintenance $answer 5 (b) calculate the cost of job 845 using abc to assign the overhead costs. $answer 17,310 (c) calculate the cost of job 845 using the plantwide overhead rate based on machine hours. (round your answer to the nearest dollar.) $answer 9,085 (d) calculate the cost of job 845 using a machine hour departmental overhead rate for the milling department ($32 per hour) and a direct hour overhead rate for the finishing department ($102 per hour). (round your answer to the nearest dollar.)

ansver
Answers: 1

Other questions on the subject: Business

image
Business, 21.06.2019 19:10, ebonsell4910
King fisher aviation is evaluating an investment project with the following case flows: $6,000 $5,500 $7,000 $8,000 discount rate 14 percent what is the discounted payback period for these cash flows if the initial cost is 15,000? what if the initial cost is $12,000? what if the cost is $16,000?
Answers: 1
image
Business, 22.06.2019 01:30, AWFHayami
Juwana was turned down for a car loan by a local credit union she thought her credit was good what should her first step be
Answers: 1
image
Business, 22.06.2019 04:30, juliashalnev
The lee family is looking to buy a house in one of two suburban areas just outside of a major city, and air quality is a top priority for them. overall air quality is calculated by taking measures in 100 locations within each suburb and then calculating a measure of central tendency. in one suburb, there is a major bus station that creates very poor air quality at its location but has no impact in the surrounding parts of the suburb. in this situation, which measure of overall suburb air quality would be most useful?
Answers: 3
image
Business, 22.06.2019 08:00, Shyshy876
3. describe the purpose of the sec. (1-4 sentences. 2.0 points)
Answers: 3
You know the right answer?
Calculating activity-based costing overhead rates assume that manufacturing overhead for goldratt co...

Questions in other subjects: