We are evaluating a project that costs $756,000, has a six-year life, and has no salvage value. assume that depreciation is straight-line to zero over the life of the project. sales are projected at 67,000 units per year. price per unit is $60, variable cost per unit is $25, and fixed costs are $665,000 per year. the tax rate is 35 percent, and we require a return of 20 percent on this project. suppose the projections given for price, quantity, variable costs, and fixed costs are all accurate to within ±10 percent. calculate the accounting break-even point.

ansver
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 07:50, pattydixon6
The questions of economics address which of the following ? check all that apply
Answers: 3
image
Business, 22.06.2019 11:50, chas8495
True or flase? a. new technological developments can us adapt to depleting sources of natural resources. b. research and development funds from the government to private industry never pay off for the country as a whole; they only increase the profits of rich corporations. c. in order for fledgling industries in poor nations to thrive, they must receive protection from foreign trade. d. countries with few natural resources will always be poor. e. as long as real gdp (gross domestic product) grows at a slower rate than the population, per capita real gdp increases.
Answers: 2
image
Business, 22.06.2019 12:00, elianagilbert3p3hh63
Areal estate agent is considering changing her cell phone plan. there are three plans to choose from, all of which involve a monthly service charge of $20. plan a has a cost of $.42 a minute for daytime calls and $.17 a minute for evening calls. plan b has a charge of $.52 a minute for daytime calls and $.15 a minute for evening calls. plan c has a flat rate of $80 with 275 minutes of calls allowed per month and a charge of $.38 per minute beyond that, day or evening. a. determine the total charge under each plan for this case: 150 minutes of day calls and 70 minutes of evening calls in a month. (do not round intermediate calculations. round your answer to 2 decimal places. omit the "$" sign in your response.)c. if the agent will use the service for daytime calls, over what range of call minutes will each plan be optimal? (round each answer to the nearest whole number. include the indifference point itself in each answer.)d. suppose that the agent expects both daytime and evening calls. at what point (i. e., percentage of total call minutes used for daytime calls) would she be indifferent between plans a and b?
Answers: 1
image
Business, 22.06.2019 13:00, shayneseaton
Reliability and validity reliability and validity are two important considerations that must be made with any type of data collection. reliability refers to the ability to consistently produce a given result. in the context of psychological research, this would mean that any instruments or tools used to collect data do so in consistent, reproducible ways. unfortunately, being consistent in measurement does not necessarily mean that you have measured something correctly. to illustrate this concept, consider a kitchen scale that would be used to measure the weight of cereal that you eat in the morning. if the scale is not properly calibrated, it may consistently under- or overestimate the amount of cereal that’s being measured. while the scale is highly reliable in producing consistent results (e. g., the same amount of cereal poured onto the scale produces the same reading each time), those results are incorrect. this is where validity comes into play. validity refers to the extent to which a given instrument or tool accurately measures what it’s supposed to measure. while any valid measure is by necessity reliable, the reverse is not necessarily true. researchers strive to use instruments that are both highly reliable and valid.
Answers: 1
You know the right answer?
We are evaluating a project that costs $756,000, has a six-year life, and has no salvage value. assu...

Questions in other subjects:

Konu
Engineering, 28.10.2019 22:31