The controller of norton industries has collected the following monthly expense data for use in analyzing the cost behavior of maintenance costs.

month total machine hours

january $2,860 320
february 3,160 370
march 3,760 520
april 4,660 670
may 3,360 520
june 5,830 720
a. determine the variable cost components using the high-low method. (round variable cost to 3 decimal places e. g. 12.250.)
variable cost per machine hour
$ the controller of norton industries has collected
b. determine the fixed components using the high-low method. (round answer to 0 decimal places e. g. 2,520.)
total fixed costs
$

ansver
Answers: 3

Other questions on the subject: Business

image
Business, 22.06.2019 07:40, sistersquad
Myflvs -question 3 multiple choice worth 2 points)(10.04 hc)in panama city in january, high tide was at midnight. the water level at high tide was 9 feet and1 foot at low tide. assuming the next high tide is exactly 12 hours later and that the height of thewater can be modeled by a cosine curve, find an equation for water level in january for panamacity as a function of time (t).of(t) = 4 + 5of(t) = 5 cost + 4o 460) = 5 cos 1+ 4of(0) = 4 cos + 5
Answers: 1
image
Business, 22.06.2019 17:40, bsheepicornozj0gc
Within the relevant range, if there is a change in the level of the cost driver, then a. total fixed costs will remain the same and total variable costs will change b. total fixed costs will change and total variable costs will remain the same c. total fixed costs and total variable costs will change d. total fixed costs and total variable costs will remain the same
Answers: 3
image
Business, 22.06.2019 18:50, lordcaos066
Plastic and steel are substitutes in the production of body panels for certain automobiles. if the price of plastic increases, with other things remaining the same, we would expect: a) the demand curve for plastic to shift to the left. b) the price of steel to fall. c) the demand curve for steel to shift to the left d) nothing to happen to steel because it is only a substitute for plastic. e) the demand curve for steel to shift to the right
Answers: 3
image
Business, 22.06.2019 20:30, Arealbot
Afirm wants to hire a project manager (pm) at a salary of $100,000. 30% of pms have high ability, and 70% of pms have low ability. high ability pms generate $120,000 in revenue and low ability pms generate $80,000 in revenue. in addition to differences in productivity, high and low ability pms have different outside offers. if a high ability pm is not hired by the firm, she can work for another company at a salary of $80,000. if the low ability pm is not hired by the firm, she can work for another company for $70,000. high ability pms are also able to get a project management professional (pmp) certification at a cost of $1,000. low ability pms are unable to get a pmp certification (they would fail the test). the firm is not able to observe a pm’s ability, but is able to observe and verify whether or not the pm has a pmp certificate.(a) draw the extensive form of the game. expert answer
Answers: 3
You know the right answer?
The controller of norton industries has collected the following monthly expense data for use in anal...

Questions in other subjects:

Konu
Mathematics, 20.03.2020 11:10