Multiple irrs. consider the following cash flows. c0 c1 c2 c3 c4 -$22 $20 $20 $20 -$40 a.) which two of the following rates are the irrs of this project: 2.5%, 7.2%, 14.3%, 33.7%, 40.0%? b.) what is the project npv if the disount rate is 5%? c.) what if is is 20%? d.) what if is is 40%? e.) why might the projects have different discount rates? f.) which projects should the manager choose? g.) which projects should the manager choose if there is no capital rationing?
Answers: 3
Business, 21.06.2019 20:30, vismayagejjala
technology is the application of knowledge and tools to solve problems and perform tasks more efficiently. t/f
Answers: 1
Business, 22.06.2019 19:10, crzyemo865
Calculating and interpreting eps information wells fargo reports the following information in its 2015 form 10-k. in millions 2015 2014 wells fargo net income $24,005 $24,168 preferred stock dividends $1,535 $1,347 common stock dividends $7,400 $6,908 average common shares outstanding 5,136.5 5,237.2 diluted average common shares outstanding 5,209.8 5,324.4 determine wells fargo's basic eps for fiscal 2015 and for fiscal 2014. round answers to two decimal places.
Answers: 3
Business, 22.06.2019 19:20, dayday0
Six years ago, an 80-kw diesel electric set cost $160,000. the cost index for this class of equipment six years ago was 187 and is now 194. the cost-capacity factor is 0.6. the plant engineering staff is considering a 120-kw unit of the same general design to power a small isolated plant. assume we want to add a precompressor, which (when isolated and estimated separately) currently costs $13291. determine the total cost of the 120-kw unit. (hint: skip $ and comma symbols)
Answers: 3
Multiple irrs. consider the following cash flows. c0 c1 c2 c3 c4 -$22 $20 $20 $20 -$40 a.) which two...
Chemistry, 10.04.2020 02:27
Mathematics, 10.04.2020 02:27
Mathematics, 10.04.2020 02:27