subject
Business, 22.10.2019 20:00 golderhadashaowtatz

Afew years ago, the boston globe reported that the city of boston planned to spend $14 million to convert the fleetcenter sports arena and entertainment center into an appropriate venue for the democratic national convention (dnc). the city engaged shawmut design and construction in a contractual relationship to complete the work, which was supposed to start 48 days prior to the commencement of the dnc on july 26. however, when negotiations between boston’s mayor and the police union broke down, the boston police patrolmen’s association took to the picket lines surrounding the fleetcenter and prevented construction crews from beginning the work. the globe reported that "a truck attempting to deliver steel turned around after a crowd of union members stood at a chain-link gate in front of the arena, shouting ‘back it up,’ and ‘respect the line, buddy.’" moreover, the globe reported that "on-duty police officers, who had been instructed to prevent pickets from restricting access, did not intervene." given the tight construction schedule, construction delays reportedly cost about $100,000 per day. the above scenario was the result of a principal–agent problem. identify the principal(s) in this situation.

ansver
Answers: 2

Other questions on the subject: Business

image
Business, 21.06.2019 21:30, strikeboystorm
White company has two departments, cutting and finishing. the company uses a job-order costing system and computes a predetermined overhead rate in each department. the cutting department bases its rate on machine-hours, and the finishing department bases its rate on direct labor-hours. at the beginning of the year, the company made the following estimates: department cutting finishing direct labor-hours 6,000 30,000 machine-hours 48,000 5,000 total fixed manufacturing overhead cost $ 264,000 $ 366,000 variable manufacturing overhead per machine-hour $ 2.00 " variable manufacturing overhead per direct labor-hour " $ 4.00 required: 1. compute the predetermined overhead rate for each department. 2. the job cost sheet for job 203, which was started and completed during the year, showed the following: department cutting finishing direct labor-hours 6 20 machine-hours 80 4 direct materials $ 500 $ 310 direct labor cost $ 108 $ 360 using the predetermined overhead rates that you computed in requirement (1), compute the total manufacturing cost assigned to job 203. 3. would you expect substantially different amounts of overhead cost to be assigned to some jobs if the company used a plantwide predetermined overhead rate based on direct labor-hours, rather than using departmental rates?
Answers: 3
image
Business, 22.06.2019 01:50, jjaheimhicks3419
Amanda rice has just arranged to purchase a $640,000 vacation home in the bahamas with a 20 percent down payment. the mortgage has a 7 percent apr compounded monthly and calls for equal monthly payments over the next 30 years. her first payment will be due one month from now. however, the mortgage has an eight-year balloon payment, meaning that the balance of the loan must be paid off at the end of year 8. there were no other transaction costs or finance charges. how much will amanda’s balloon payment be in eight years
Answers: 3
image
Business, 22.06.2019 12:00, DeathFightervx
Need today! will get brainliest for right answer! compare and contrast absolute advantage and comparative advantage.
Answers: 1
image
Business, 22.06.2019 13:00, shayneseaton
Reliability and validity reliability and validity are two important considerations that must be made with any type of data collection. reliability refers to the ability to consistently produce a given result. in the context of psychological research, this would mean that any instruments or tools used to collect data do so in consistent, reproducible ways. unfortunately, being consistent in measurement does not necessarily mean that you have measured something correctly. to illustrate this concept, consider a kitchen scale that would be used to measure the weight of cereal that you eat in the morning. if the scale is not properly calibrated, it may consistently under- or overestimate the amount of cereal that’s being measured. while the scale is highly reliable in producing consistent results (e. g., the same amount of cereal poured onto the scale produces the same reading each time), those results are incorrect. this is where validity comes into play. validity refers to the extent to which a given instrument or tool accurately measures what it’s supposed to measure. while any valid measure is by necessity reliable, the reverse is not necessarily true. researchers strive to use instruments that are both highly reliable and valid.
Answers: 1
You know the right answer?
Afew years ago, the boston globe reported that the city of boston planned to spend $14 million to co...

Questions in other subjects:

Konu
Mathematics, 11.11.2020 01:00
Konu
Chemistry, 11.11.2020 01:00
Konu
Mathematics, 11.11.2020 01:00
Konu
Mathematics, 11.11.2020 01:00
Konu
Mathematics, 11.11.2020 01:00