Rose is a project manager at the civil engineering f) consulting firm of sands, gravel, concrete, and waters, inc. she has been collecting data on a project in which concrete pillars were being constructed; however not all the data are available. she has been able to find out that the 10th pillar required 260 person-hour to con truct and that a 75% learning curve applied. she is interested in calculating the time required to construct the i st and 20th pillars. compute the value for her.

ansver
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 10:00, annafellows
Cynthia is a hospitality worker in the lodging industry who prefers to cater to small groups of people. she might want to open a
Answers: 3
image
Business, 22.06.2019 16:00, anonymous1813
Winners of the georgia lotto drawing are given the choice of receiving the winning amount divided equally over 2121 years or as a lump-sum cash option amount. the cash option amount is determined by discounting the annual winning payment at 88% over 2121 years. this week the lottery is worth $1616 million to a single winner. what would the cash option payout be?
Answers: 3
image
Business, 22.06.2019 19:50, crzyemo865
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
image
Business, 23.06.2019 14:30, tyler9585
After four years aspen earned 510$ in simple interest from a cd into which she initially deposited $3000 what was the annual interest rate of the cd
Answers: 3
You know the right answer?
Rose is a project manager at the civil engineering f) consulting firm of sands, gravel, concrete, an...

Questions in other subjects:

Konu
Medicine, 12.04.2021 22:00
Konu
Mathematics, 12.04.2021 22:00