Acolleague from the plant in germany has arrived at the chicago plant to share insights on a recent product line changeover implemented in germany. this changeover has saved thousands of euros at the german facility, but jim does not think it will work in the united states. jim feels that there is a completely different attitude towards work and innovation in the u. s., and in fact, thinks the german facility is technologically behind his plant. additionally, the colleague often mispronounces words when he speaks english, and doesn’t dress appropriately for the u. s. office. he showed up to work on the plant floor in a formal suit and tie, with dress shoes that had a slippery sole. however, the colleague is a guest, and it is important that jim pretends to be interested.
a. psychological barriersb. grandstandingc. thought speedd. nonverbal distractions

ansver
Answers: 2

Other questions on the subject: Business

image
Business, 22.06.2019 20:50, fathimasaynas2975
Lead time for one of your fastest-moving products is 20 days. demand during this period averages 90 units per day. a) what would be an appropriate reorder point? ) how does your answer change if demand during lead time doubles? ) how does your answer change if demand during lead time drops in half?
Answers: 1
image
Business, 22.06.2019 23:30, bb1593
As a result of a thorough physical inventory, waterway company determined that it had inventory worth $320200 at december 31, 2020. this count did not take into consideration the following facts: walker consignment currently has goods worth $47400 on its sales floor that belong to waterway but are being sold on consignment by walker. the selling price of these goods is $75900. waterway purchased $21900 of goods that were shipped on december 27, fob destination, that will be received by waterway on january 3. determine the correct amount of inventory that waterway should report.
Answers: 2
image
Business, 23.06.2019 02:00, kyralynn123
You are considering the purchase of one of two machines used in your manufacturing plant. machine 1 has a life of two years, costs $20,000 initially, and then $4,000 per year in maintenance costs. machine 2 costs $25,000 initially, has a life of three years, and requires $3,500 in annual maintenance costs. either machine must be replaced at the end of its life with an equivalent machine. using eac which is the better machine for the firm
Answers: 1
image
Business, 23.06.2019 02:10, Thejollyhellhound20
Make or buy eastside company incurs a total cost of $120,000 in producing 10,000 units of a component needed in the assembly of its major product. the component can be purchased from an outside supplier for $11 per unit. a related cost study indicates that the total cost of the component includes fixed costs equal to 50% of the variable costs involved. a. should eastside buy the component if it cannot otherwise use the released capacity? present your answer in the form of differential analysis. use negative sign represent a net disadvantage answer; otherwise do not use negative signs with your answers. cost from outside supplier $answer variable costs avoided by purchasing answer net advantage (disadvantage) to purchase alternative $answer b. what would be your answer to requirement (a) if the released capacity could be used in a project that would generate $50,000 of contribution margin? use negative sign represent a net disadvantage answer; otherwise do not use negative signs with your answers.
Answers: 2
You know the right answer?
Acolleague from the plant in germany has arrived at the chicago plant to share insights on a recent...

Questions in other subjects:

Konu
Mathematics, 03.02.2021 22:40
Konu
Mathematics, 03.02.2021 22:40
Konu
Biology, 03.02.2021 22:40