subject
Business, 12.09.2019 20:30 devikapal101

Kevin plans to put concrete on a rectangular portion of his driveway. the portion is 10 feet long and 3 inches high. the price of concrete is $98 per cubic yard. the total cost of the concrete kevin needs is $72.59. which of the following is closest to the width of the portion of the driveway on which kevin plans to put concrete? [1 foot = 12 inches; 1 yard = 3 feet]a.3 feetb.6 feetc.8 feetd.10 feet

ansver
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 06:30, hannahroswall1
Ummit record company is negotiating with two banks for a $157,000 loan. fidelity bank requires a compensating balance of 24 percent, discounts the loan, and wants to be paid back in four quarterly payments. southwest bank requires a compensating balance of 12 percent, does not discount the loan, but wants to be paid back in 12 monthly installments. the stated rate for both banks is 9 percent. compensating balances will be subtracted from the $157,000 in determining the available funds in part a. a-1. calculate the effective interest rate for fidelity bank and southwest bank. (do not round intermediate calculations. input your answers as a percent rounded to 2 decimal places.) a-2. which loan should summit accept? southwest bank fidelity bank b. recompute the effective cost of interest, assuming that summit ordinarily maintains $37,680 at each bank in deposits that will serve as compensating balances
Answers: 1
image
Business, 22.06.2019 23:10, BABA761
Asemiprofessional baseball team near your town plays two home games each month at the local baseball park. they split the concessions 50/50 with the city, but keep revenue from ticket sales for themselves. the city charges the team $100 each month for the three-month season. the team pays the players and manager a total of $1,000 a month. the team charges $10 for each ticket, and the average customer spends $7 at the concession stand. attendance averages 30 people at each home game. in order to break even, how many tickets does the team need to sell for each game? a. 33b. 37c. 41e. 49f. 244
Answers: 1
image
Business, 23.06.2019 02:20, FatCatcreator
Speedy auto repairs uses a job-order costing system. the company’s direct materials consist of replacement parts installed in customer vehicles, and its direct labor consists of the mechanics’ hourly wages. speedy’s overhead costs include various items, such as the shop manager’s salary, depreciation of equipment, utilities, insurance, and magazine subscriptions and refreshments for the waiting room. the company applies all of its overhead costs to jobs based on direct labor-hours. at the beginning of the year, it made the following estimates: direct labor-hours required to support estimated output 20,000 fixed overhead cost $ 350,000 variable overhead cost per direct labor-hour $ 1.00 required: 1. compute the predetermined overhead rate. 2. during the year, mr. wilkes brought in his vehicle to replace his brakes, spark plugs, and tires. the following information was available with respect to his job: direct materials $ 590 direct labor cost $ 109 direct labor-hours used 6
Answers: 1
image
Business, 23.06.2019 07:50, TH3L0N3W0LF
Anew joint command and control system is being developed to meet the strategic information needs of all the military services. the air force is the lead service, but the army and navy have different points of view about what functions the system should perform. which one of the software acquisition best practices would be most relevant in managing this issue as the program office undertakes system development?
Answers: 3
You know the right answer?
Kevin plans to put concrete on a rectangular portion of his driveway. the portion is 10 feet long an...

Questions in other subjects:

Konu
Biology, 05.03.2021 14:00