subject
Business, 06.09.2019 19:20 50057543

Taher plans to cut the 3 pieces of lumber for the flower bed border from a single piece of lumber. each cut takes inch of wood off the length of the piece of lumber. among the following lengths, in inches, of pieces of lumber, which is the shortest piece that he can use to cut the pieces for the flower bed border?

ansver
Answers: 3

Other questions on the subject: Business

image
Business, 21.06.2019 21:30, strikeboystorm
White company has two departments, cutting and finishing. the company uses a job-order costing system and computes a predetermined overhead rate in each department. the cutting department bases its rate on machine-hours, and the finishing department bases its rate on direct labor-hours. at the beginning of the year, the company made the following estimates: department cutting finishing direct labor-hours 6,000 30,000 machine-hours 48,000 5,000 total fixed manufacturing overhead cost $ 264,000 $ 366,000 variable manufacturing overhead per machine-hour $ 2.00 " variable manufacturing overhead per direct labor-hour " $ 4.00 required: 1. compute the predetermined overhead rate for each department. 2. the job cost sheet for job 203, which was started and completed during the year, showed the following: department cutting finishing direct labor-hours 6 20 machine-hours 80 4 direct materials $ 500 $ 310 direct labor cost $ 108 $ 360 using the predetermined overhead rates that you computed in requirement (1), compute the total manufacturing cost assigned to job 203. 3. would you expect substantially different amounts of overhead cost to be assigned to some jobs if the company used a plantwide predetermined overhead rate based on direct labor-hours, rather than using departmental rates?
Answers: 3
image
Business, 22.06.2019 15:40, Fire8615
Colter steel has $5,550,000 in assets. temporary current assets $ 3,100,000 permanent current assets 1,605,000 fixed assets 845,000 total assets $ 5,550,000 assume the term structure of interest rates becomes inverted, with short-term rates going to 10 percent and long-term rates 2 percentage points lower than short-term rates. earnings before interest and taxes are $1,170,000. the tax rate is 40 percent earnings after taxes = ?
Answers: 1
image
Business, 22.06.2019 17:20, sctenk6052
“strategy, plans, and budgets are unrelated to one another.” do you agree? explain. explain how the manager’s choice of the type of responsibility center (cost, revenue, profit, or investment) affects the behavior of other employees.
Answers: 3
image
Business, 22.06.2019 19:00, camidevecchis15
15. chef a insists that roux is the traditional thickener for bisque. chef b insists that it's rice. which chef is correct? a. neither chef is correct. b. both chefs are correct. c. chef b is correct. d. chef a is correct.
Answers: 1
You know the right answer?
Taher plans to cut the 3 pieces of lumber for the flower bed border from a single piece of lumber. e...

Questions in other subjects:

Konu
History, 14.04.2021 21:50
Konu
Biology, 14.04.2021 21:50
Konu
Social Studies, 14.04.2021 21:50