subject
Business, 22.08.2019 05:30 lizzyboo32

Ashortage of qualified personnel is one of the main reason that companies outsource. a project may require experts in a particular field for several months and planning for this procurement ensures that the needed services will be available for the project. which benefit does this characteristic of outsourcing provide an organization?

ansver
Answers: 1

Other questions on the subject: Business

image
Business, 22.06.2019 05:30, mem8163
U. s. internet advertising revenue grew at the rate of r(t) = 0.82t + 1.14 (0 ≤ t ≤ 4) billion dollars/year between 2002 (t = 0) and 2006 (t = 4). the advertising revenue in 2002 was $5.9 billion.† (a) find an expression f(t) giving the advertising revenue in year t.
Answers: 1
image
Business, 22.06.2019 08:10, alex7881
The last time he flew jet value air, juan's plane developed a fuel leak and had to make an 4) emergency landing. the time before that, his plane was grounded because of an electrical problem. juan is sure his current trip will be fraught with problems and he will once again be delayed. this is an example of the bias a) confirmation b) availability c) selective perception d) randomness
Answers: 1
image
Business, 22.06.2019 17:30, tysisson9612
You should do all of the following before a job interview except
Answers: 2
image
Business, 22.06.2019 19:50, crzyemo865
Aproduction line has three machines a, b, and c, with reliabilities of .96, .86, and .85, respectively. the machines are arranged so that if one breaks down, the others must shut down. engineers are weighing two alternative designs for increasing the line’s reliability. plan 1 involves adding an identical backup line, and plan 2 involves providing a backup for each machine. in either case, three machines (a, b, and c) would be used with reliabilities equal to the original three. a. compute overall system reliability under plan 1. (round your intermediate calculations and final answer to 4 decimal places.) reliability b. compute overall system reliability under plan 2. (round your intermediate calculations and final answer to 4 decimal places.) reliability c. which plan will provide the higher reliability? plan2plan1
Answers: 3
You know the right answer?
Ashortage of qualified personnel is one of the main reason that companies outsource. a project may r...

Questions in other subjects:

Konu
Mathematics, 06.05.2021 19:10
Konu
Mathematics, 06.05.2021 19:10