subject
Business, 08.08.2019 17:20 beaaaaast3

Which statement below correctly describes how to manage span of control using the modular concept?
a. span of control may be extended beyond 1: 10 in order to ensure that more resources can be deployed on complex, large incidents
b. span of control should be established without consideration of factors such as the type of incident, nature of the task, hazards, and safety factors
c. span of control is less of a factor of concern for incidents that are resolved within the initial operational period
d. span of control is accomplished by organizing resources into teams, divisions, groups, branches, or sections

ansver
Answers: 3

Other questions on the subject: Business

image
Business, 21.06.2019 17:00, mqturner1989Kedie
What are ways individuals may reduce their total education and training costs?
Answers: 3
image
Business, 21.06.2019 19:20, lukeperry
Astock with a beta of 0.6 has an expected rate of return of 13%. if the market return this year turns out to be 10 percentage points below expectations, what is your best guess as to the rate of return on the stock? (do not round intermediate calculations. enter your answer as a percent rounded to 1 decimal place.)
Answers: 2
image
Business, 23.06.2019 00:10, Easton777
Wang distributors has an annual demand for an airport metal detector of 1 comma 350 units. the cost of a typical detector to wang is $400. carrying cost is estimated to be 19% of the unit cost, and the ordering cost is $24 per order. if ping wang, the owner, orders in quantities of 300 or more, he can get a 10% discount on the cost of the detectors. should wang take the quantity discount? \
Answers: 1
image
Business, 23.06.2019 01:00, americanbellabeauty
Jimmy's delicatessen sells large tins of tom tucker's toffee. the deli uses a periodic review system, checking inventory levels every 88 days, at which time an order is placed for more tins. order lead time is 22 days. daily demand is a constant 1515 tins, so average demand during the reorder period and order lead time (1010 days) is 150150 tins. draw a sawtooth diagram. assume that the beginning inventory level is equal to the restocking level and the desired service level is 99.9%. what is the safety stock level? (hint: look at the formula for calculating restocking level.) what is the average inventory level? the safety stock level is average inventory level is __chart: time (10,20,30), tins (0,150) lines touching both axisthe safety stock level is 0 tinsthe average inventory level is 75 tins
Answers: 2
You know the right answer?
Which statement below correctly describes how to manage span of control using the modular concept? <...

Questions in other subjects:

Konu
History, 05.05.2020 16:17