subject
Business, 06.08.2019 19:30 ayoismeisalex

Asimple random sample of size n is drawn from a population that is known to be normally distributed. the sample variance, s squareds2, is determined to be 11.611.6. complete parts (a) through (c). (a) construct a 90% confidence interval for sigma squaredσ2 if the sample size, n, is 20. the lower bound is 7.317.31. (round to two decimal places as needed.) the upper bound is 21.7921.79. (round to two decimal places as needed.) (b) construct a 90% confidence interval for sigma squaredσ2 if the sample size, n, is 30. the lower bound is 7.907.90. (round to two decimal places as needed.) the upper bound is 1919. (round to two decimal places as needed.) how does increasing the sample size affect the width of the interval? the width does not change the width increases the width decreases

ansver
Answers: 3

Other questions on the subject: Business

image
Business, 21.06.2019 20:30, cajunldy2001
Elizabeth believes her company has discriminated against her because her minority coworkers, who are less qualified, have been promoted ahead of her. which agency should elizabeth contact? - national alliance of business- affirmative action council- equal employment opportunity commission- federal trade commission- fair employment practices agency
Answers: 2
image
Business, 22.06.2019 07:30, suyi14
An important application of regression analysis in accounting is in the estimation of cost. by collecting data on volume and cost and using the least squares method to develop an estimated regression equation relating volume and cost, an accountant can estimate the cost associated with a particular manufacturing volume. consider the following sample of production volumes and total cost data for a manufacturing operation. production volume (units) total cost ($) 400 4000 450 5000 550 5400 600 5900 700 6400 750 7000 compute b 1 and b 0 (to 2 decimals if necessary). b 1 b 0 complete the estimated regression equation (to 2 decimals if necessary). = + x what is the variable cost per unit produced (to 1 decimal)? $ compute the coefficient of determination (to 4 decimals). note: report r 2 between 0 and 1. r 2 = what percentage of the variation in total cost can be explained by the production volume (to 2 decimals)? % the company's production schedule shows 500 units must be produced next month. what is the estimated total cost for this operation (to 2 decimals)? $
Answers: 1
image
Business, 22.06.2019 16:30, AriaMartinez
Corrective action must be taken for a project when (a) actual progress to the planned progress shows the progress is ahead of schedule. (b) the technical specifications have been met. (c) the actual cost of the activities is less than the funds received for the work completed. (d) the actual progress is less than the planned progress.
Answers: 2
image
Business, 22.06.2019 17:40, lukecoupland4401
Solomon chemical company makes three products, b7, k6, and x9, which are joint products from the same materials. in a standard batch of 320,000 pounds of raw materials, the company generates 70,000 pounds of b7, 150,000 pounds of k6, and 100,000 pounds of x9. a standard batch costs $3,840,000 to produce. the sales prices per pound are $10, $14, and $20 for b7, k6, and x9, respectively. (a) allocate the joint product cost among the three final products using weight as the allocation base. (b) allocate the joint product cost among the three final products using market value as the allocation base. (c) allocate the joint product cost among the three final products using weight as the allocation base.
Answers: 3
You know the right answer?
Asimple random sample of size n is drawn from a population that is known to be normally distributed....

Questions in other subjects:

Konu
Mathematics, 30.03.2021 20:50
Konu
Mathematics, 30.03.2021 20:50