subject
Business, 29.06.2019 01:00 jaedenevan062907

What are three elements that can be shared by subdocuments in a master document? a. page numbers, rules, and a table of contents b. source files, file names, and page numbers c. rules, a table of contents, and file names d. source files, page numbers, and rules

ansver
Answers: 1

Other questions on the subject: Business

image
Business, 21.06.2019 14:30, madim1275
As he explores his options, sergio notices that some opportunities appear to be riskier than others. when considering various opportunities, sergio should keep in mind that:
Answers: 1
image
Business, 22.06.2019 02:30, llama1314
Sweeten company had no jobs in progress at the beginning of march and no beginning inventories. the company has two manufacturing departments--molding and fabrication. it started, completed, and sold only two jobs during march—job p and job q. the following additional information is available for the company as a whole and for jobs p and q (all data and questions relate to the month of march): molding fabrication total estimated total machine-hours used 2,500 1,500 4,000 estimated total fixed manufacturing overhead $ 10,000 $ 15,000 $ 25,000 estimated variable manufacturing overhead per machine-hour $ 1.40 $ 2.20 job p job q direct materials $ 13,000 $ 8,000 direct labor cost $ 21,000 $ 7,500 actual machine-hours used: molding 1,700 800 fabrication 600 900 total 2,300 1,700 sweeten company had no underapplied or overapplied manufacturing overhead costs during the month. required: for questions 1-8, assume that sweeten company uses a plantwide predetermined overhead rate with machine-hours as the allocation base. for questions 9-15, assume that the company uses departmental predetermined overhead rates with machine-hours as the allocation base in both departments. 1. what was the company’s plantwide predetermined overhead rate? (round your answer to 2 decimal places.) next
Answers: 2
image
Business, 22.06.2019 09:00, 0318929
How does the plaintiff, mrs. wood, try to implicate the gun manufacturer ( who testifies, what do they say, what evidence is introduced)?
Answers: 2
image
Business, 23.06.2019 01:10, CarlsonB
1. alwaysrain irrigation, inc. would like to determine capacity requirements for the next four years. currently, two production lines are in place for making bronze and plastic sprinklers. three types of sprinklers are available in both bronze and plastic: 90-degree nozzle sprinklers, 180-degree nozzle sprinklers, and 360-degree nozzle sprinklers. management has forecast demand for the next four years as follows: both production lines can produce all the different types of nozzles. the bronze machines needed for the bronze sprinklers require two operators and can produce up to 12,000 sprinklers. the plastic injection molding machine needed for the plastic sprinklers requires four operators and can produce up to 200,000 sprinklers. three bronze machines and only one injection molding machine are available. what are the capacity requirements for the next four years? (assume that there is no learning.)
Answers: 1
You know the right answer?
What are three elements that can be shared by subdocuments in a master document? a. page numbers, r...

Questions in other subjects:

Konu
Mathematics, 15.01.2022 08:10
Konu
English, 15.01.2022 08:10
Konu
Mathematics, 15.01.2022 08:20