Engineering, 21.08.2019 05:20 Absynthe3986
Calculate the operational availability for a power generator with 1 scheduled maintenance per 1000 hours of operation and failure rate of 0.6 failures per 1000 hours. preventive maintenance takes on average 8 hours, however if the engine fails, it typically takes 26 hours to repair it. logistics and administrative delays typically add extra 12 hours to the maintenance time.
Answers: 1
Engineering, 04.07.2019 18:10, xboxdude06
Slip occurs via two partial dislocations because of (a) the shorter path of the partial dislocation lines; (b) the lower energy state through partial dislocations; (c) the charge balance.
Answers: 1
Engineering, 04.07.2019 18:20, AnonymousLizard52303
A2-m rigid tank initially contains saturated water vapor at 100 kpa. the tank is connected to a supply line through a valve. steam is flowing in the supply line at 600 kpa and 300 c. the valve is opened, and steam is allowed to enter the tank until the pressure in the tank reaches the line pressure, at which point the valve is closed. a thermometer placed in the tank indicates that the temperature at the final state is 200°c. determine (a) the mass of steam that has entered the tank (b) the amount of heat transfer.
Answers: 3
Engineering, 04.07.2019 19:20, carterdaw
Aseries piping system conveys methyl alcohol. the system consists of 70 m of 1- nominal pipe follow by 50 m of 2-nominal pipe, both schedule 40 commercial steel. the 1-nominal pipe contains 3 90° elbows (regular) anda fully open gate valve, all threaded. the pressure drop through the system is 150 kpa. determine the volume flow rate through the system that is horizontally laid.
Answers: 1
Calculate the operational availability for a power generator with 1 scheduled maintenance per 1000 h...
Mathematics, 26.08.2021 01:00
English, 26.08.2021 01:00
Mathematics, 26.08.2021 01:00
Social Studies, 26.08.2021 01:00
Mathematics, 26.08.2021 01:00
English, 26.08.2021 01:00